From: route@monster.com
Sent: Thursday, April 07, 2016 12:01 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Anthony George 4015 SE 17th Street, Ocala, Florida 34471 352-875-3765 E-mail: tgeorge31@yahoo.com I am a
state-of-the-art Project Scheduler and Outage Scheduler with extensive hands
on project planning, cost control and scheduling with Primavera P6 and
Microsoft Project. I manage the outage process of bidding, customer
acceptance, site use, and post project review by developing enterprise
schedules, identifying critical path, and analyzing for impacts and budget
expense. I manage the job site methodology of vendor biding and
selection, develop and maintain budgets, and monitor subcontractor and job
costs. I am trained in process improvement and building improved workflows. I
have a strong technical, consulting and Business Analyst background that I
draw on to help with the planning and advisory process. I have over ten years
in planning and managing projects. WORK
EXPERIENCE Project
Controller– December 2012 – Present Mitsubishi Hitachi
Power Systems, Lake Mary Florida -Provide outage
planning, scheduling and execution for Gas, Steam, Nuclear turbine and
generator construction and maintenance projects for various clients
throughout the United States and South America. -Maintain SAP
costs, inventory, calculate weekly and monthly burns -Define outage
scopes and details, -Identify need for
Requests for Information -Manpower loading
and Earned Value calculating - Recommend
alternative methods of standardized analysis as a basis for solving problems.
-Prepare project
schedules on Primavera P3, P6 and Microsoft Project 2007, 2010 with WBS,
activities and milestones -Maintain all field
and corporate schedules within Microsoft Project Server 2010 or Primavera
Enterprise Management system. -Analyze and
mitigate schedules for impacts, cost load schedules -Prepare and
maintain Critical Path Method (CPM) schedules -Create project
plans; identify tasks to be performed, necessary requirements, deliverables
and milestones. - Develop detailed budgets, Monitor subcontractor costs, job costs, develop action plans, analyze
variances, determine system improvements, and initiate corrective actions and
complete audits. -Analyze, compare
and forecast current status against established baseline schedule and cost -Develop and
maintain work packages, extra work activates, delay logs and lessons learned
documents - Travel for
extended timeframes as needed throughout the United States and South America - Cost estimate job
by utilizing Hard Dollar -OSHA Certified I reported to both
departments at the University of Florida and worked with Shands Hospital. IT Senior Analyst -
Intranet Web Services – April 2010 – December 2012 The Academic Health
Center, University of Florida, Gainesville FL - Project Manager
and Planner for all AHC Information Technology projects, developed and
maintained budgets, Work break down structure and schedules - All schedules are
developed within Primavera P3/P6 or Microsoft Project 2007/2010 -Write Business
Requirement Documentation – Turn ideas into usable documents to coordinate
development -Write Scope
documents – develop scope documents to determine if a project is needed or
will move forward -Manage budget in
relation to projects, buying assets, and salary -Prepare and
distribute information reports, such as status reports, progress reports and
minutes of meetings to stakeholders. -Ensure a common
understanding and set expectations through communication to align the
stakeholders and team members. -Managed team
members to achieve their tasks effectively and efficiently. -Participate in
developing project risks and project lessons learned. -Wrote quality
assurance manuals and systems business requirements. -Ensured project
deliverables conformed to quality standards established in the project
quality plan and obtain final acceptance for the project. -Providing business
intelligence through process mapping and workflow diagrams to improve application
usage, consolidation and redesign. -Business mapping
was delivered through Visio diagrams, discovery and as built documents -Wrote test plans
and use acceptance documents for various system acceptance -Develop hospital
data reports through business objects IT Senior - March
2010 – July 2011 Department of
Anesthesiology at the University of Florida - Gainesville, Florida - Manage the IT
infrastructure for a 400 user environment for the Department Of
Anesthesiology - Managed IT
personal consisting of desktop, server, and programmers. - Work with
offshore developers to provide custom research software - Responsible for
Department budget which included all assets, software and salary - Built a team
environment in a very short time -
Developed a full training program for Attendings, Residents, AAs and CRNAs - Train all
residents each rotation on CPA, CPM, and Ihrm in both a classroom and OR - Develop and
write all training material for Attendings, Residents and CRNAs - Consolidated all
servers to VMware Vsphere - Support and
develop all Departmental research needs - Custom reporting
with Crystal Reports - Manage GE
Healthcare's Centricity Perioperative Anesthesia (CPA) including all
configuration, variables, vForms, Monitor Capture, Script Configuration, and
billing - Developed and
maintain HL7 dump file from CPA and CPM into Cenricity IDX for billing
purposes. - Big Aim Project –
Create and maintain a transfer of care document from presurgical, OR,
inpatient and clinic. The purpose is to not take the place of an H&P or
EMR record but to allow pertinent information to be shared amongst the
different clinical divisions and viewed in a central location. This was
being done through an Hl7 workflow into an XML infopath form housed in SharePoint
using the SP data connector. - Manage GE
HealthCare’s Centricity Perioperative Manager including Doctors preference
cards, Clinical Documentation, OR Manager, Pathway Manger, OR Scheduler, and
Patient Manager - Maintain Doctor
Satisfaction by listening to requests and providing solutions. - Negotiate
and maintain all vendor relationships and contracts - Document
business ideas; turn them into business requirements to allow for development
and production use. - Have process
mapped patient flow from the clinic, Pre-OP, Intra-OP, PACU, Floor and
discharge to enhance business and patient process for the Department Of
Anesthesiology and Shands Hospital. This included several walk through and
scrubs outs with Patients and Attendings. Engagement Manager
/ Project Manager – February 2007/ February 2010 Taylor, Bean &
Whitaker - Ocala, Florida I was the
Engagement/ Project Manager for Platinum Bank, Platinum Title and Insurance
Lines of Business. I handled everything from new hires, to procurement,
contract negations, schedules and documentation of business practices and
requirements. I managed all projects that correlated with the business. TBW
had to close their mortgage doors August 2009, I stayed on till the title and
insurance businesses were sold in February of 2010. -Participated in
all phases of multiple projects including planning, budgets and monitoring
costs, developing action plans, forecasting project requirements, analyzing
variances, determining system improvements, initiating corrective actions and
completing audits. All schedules are developed on Primavera P3. -Facilitate Project
WBS, resource allocation and loading, create and maintain schedules and
provide key project tracking data to Project Lead. -Managed a
multi-disciplinary team of various specialists and contractors and ensure
they comply with work specifications, safety standards and regulatory
requirements. - Maintained
property management holding software platforms on Yardi and Microsoft
Dynamics -Develop, Measure
and report Project plans, prepare project status report, monthly progress
reports and customized client report. -Wrote several
business requirement documents for program acceptance. -Serve as primary
point of contact for prospective and current clients. -Design all
Standard Operating Procedures (SOPs) to standardize daily operations. Senior Consultant
April 2006/January 2007 RapidApp – Chicago IL As a Senior
Consultant for RapidApp it was my responsibility to provide custom solutions
to clients in the areas of Project Management, scheduling, planning and
development on VMware, Citrix, SharePoint design and implementation, Active
Directory support and Softricity 4.0 implantation. RapidApp was a primary
contractor for Dell. -Provided VMware
design and implementation to a large Insurance Company base in Cincinnati
Ohio. -Provided VMware
project management, design, implementation and training to a large soda
manufacture based in North Carolina. The engagement consisted of designing
and building Vmware ESX 2.5.3 servers under best practices for security and
service delivery to guest systems. Virtual Center 1.3 was designed to fit the
client’s needs and PlateSpin was utilized to perform the P2V process. -Provide SharePoint
project management, design, implementation and training to a midsize
healthcare provider in Chicago Illinois. The engagement consisted of a
SharePoint 2003 centering on web presence, document library, and calendaring
and team collaboration. -Provided Citrix
project management design and implementation to a large healthcare provider
based in Dallas Texas. -Provided VMware
design and implantation to a large soda manufacture in Winston Salem, NC - Provided VMware
design to a Mortgage Company, in Ocala Florida Lead Technical
Analyst III - March 2004/April 2006 -Shands Hospital - Gainesville, FL - Instituted VMware
ESX Currently virtualizing 64 server candidates, 10 hosts planed and 90% of
server inventory, 320 servers, Successfully P2V various guests, Virtual
Center, ESX Ranger -Implemented Microsoft Operations Manager 2005 -Manage
over 320 Microsoft 2000/2003 and 40 Novell Netware 6.5 servers - Project manager
and technical lead for the Active Directory 2003 Implementation in the Shands
environment. The Active Directory project was very complex as it affected
every department within the Shands HealthCare environment, which includes
various locations, 10,000 users, 7,000 workstations and over 300 servers - Write and develop
complex project plans, documentation and power point presentations
surrounding various projects - As the technical
lead, I developed the Active Directory platform structure consisting of tree,
domain, user, server OU and DNS design - Developed a
production test lab in VMware, which allows our team to test and develop
products and code in an environment mirroring production - Along with Active
Directory, I lead Identity Management which includes Novell's Identity
Manager 2.1 in which I wrote the XML script s to connect eDirectory, Active
Directory, GroupWise and PeopleSoft. Migrated over to M-Tech which will
connect eDirectory, Active Directory, GroupWise, PeopleSoft, RACF as well as
other directories. - Participated in
the Netware 5.1 to 6.5 Migration Project in which I lead or was a technical
resource in over forty migrations - Created NCF files
to fix known eDirectory issues that can be utilized by other team members. -
Led and completed many vendor environment upgrades, such as Novius, Ingenix
and the Medicode on IDX - Lead team and
project meetings with other departments - Developed the
user principal name Visual Basic script to create the UPNs within the new
domain Education: Bachelors of Arts,
DePaul University Project Management
Institute VMware Certified
Professional Microsoft Certified
Professional Microsoft Certified
Systems Engineer Citrix Certified
Enterprise Administrator |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|